Answer a few questions about your project and get a written planning estimate instantly. It is based on our 2026 Toronto cost guide ranges. A final fixed quote still needs a site review and your drawings.
1. What are you renovating?
2. How big is it?
3. What level of finish?
4. Anything else in scope?
Your planning estimate
Cost item
Estimate
Building permit allowance
$1,000 – $2,500
Contingency (10–15%)
Estimated total
Line costs are planning allocations of the total, not fixed trade quotes — final line pricing follows drawings review.
Planning estimate only, before HST. It does not replace a fixed quote. Committee of Adjustment, if a variance is needed, is a separate $2,228.98 fee.
Send us your drawings for a detailed written estimate
Fill in your details, upload your drawings, and we will come back with a detailed written estimate.
Email your drawings to us and we will come back with a detailed written estimate. Attach your drawings to the email, and include your name, phone, and the estimate summary shown above.