Renovations go wrong in predictable ways: a vague contract, payments that run ahead of the work, and a holdback that gets released too early. This checklist covers the three things that protect you most — the contract clauses, the payment milestone structure, and the statutory holdback under Ontario’s Construction Act.
Use the interactive checklist below right on this page, or download the full printable PDF version to take to your contractor meetings.
Tick off each item as you confirm it. Your ticks stay in your own browser — nothing is sent to us.
Before you sign
Payment milestones
Statutory holdbacks (Ontario’s Construction Act)
Before your final payment
What the printable PDF adds
The downloadable version lays out the same checklist in full, with the reasoning behind each item — why the holdback exists, what the 10% estimate rule means in practice, and what to do when a lien is filed. Print it, bring it to contractor meetings, and check items off as you go.
If you are about to sign a renovation contract, or you are already in a project where payments and paperwork feel out of control, bring the contract and the payment schedule to a free 1-hour consultation. We will walk through what protects you and what does not — before the next payment goes out.
Call 1-888-688-8864 or reach us through the contact page.