ONTARIO CONSTRUCTION ACT COMPLIANT (R.S.O. 1990, c. C.30)
Date: Oct 28, 2026
Proposal Ref: #TRC-EST-9821
CLIENT: PROJECT TYPE:Kitchen Remodel
SITE ADDRESS: ESTIMATED AREA:380 SQ FT
1
Project Scope, Specs & Feasibility
Configure parameters, area, finish grades, and contingency reserves.
Step 1 of 5
Toronto pricing only — labour and material rates reflect City of Toronto costs. Enter a Toronto (M) postal code to send your estimate for review.
1.35x Multiplier
Square Footage
SQ FT
Presets:
Unforeseen Renovation Contingency10%
Recommended buffer for hidden behind-wall plumbing or electrical findings.
GC Project Management & Overhead12%
Full-time site supervision, insurance, logistics, and trade coordination.
2
Interactive Blueprint & Drawing Studio
Upload your own floor plans or markup our sample architectural drawing with trade pins & pen zones.
Pins:
Drop Floor Plan or Sketch
Supports JPG, PNG, Blueprint drawings
Click to drop active pin on drawing. Pins dynamically adjust estimate contingency.
Pins: 0 | Buffer Impact: $0
Attached Blueprint Scope Identifiers:
Plan Takeoff — Measured RoomsScale: not set — click Calibrate Scale, then click two points on a known dimension.
Measured total: 0 sq ft (0 rooms)
Pins stay where you dropped them when you turn pages.
How it works: Calibrate Scale on a labelled dimension, then click Measure Rooms and click around each room on the plan. Finish Room saves it. Apply sends the total measured area to step 1, and step 3 quantities update from it. Uploading a new plan clears measurements.
3
Granular Multi-Trade Line-by-Line Breakdown
Over 30 Toronto standard trade items. Edit unit rates or quantities directly in the grid.
Inc
Trade Scope Description
Qty
Unit
Rate ($)
Total ($)
* Toronto rates, scaled by Finish Grade multiplier. Counter and backsplash quantities are set per project type; wall lines (framing, insulation, drywall, wall paint) use wall area - 3x floor area - at per-wall-sq-ft rates; other per-sq-ft quantities follow floor area.0 items active
4
Ontario Construction Act (R.S.O. 1990) Payment Schedule
Mandatory statutory compliance: Maximum 10% draw per verified stage with 10% statutory lien holdback deduction.
Step 4 of 5
Statutory 10% Basic Holdback (Ontario Construction Act, Section 22)
Every payer upon a contract or subcontract shall retain a 10% holdback from each progress payment. By law, this holdback cannot be released until 60 calendar days following the publication of the Certificate of Substantial Performance (CSP / Form 9) in a construction trade newspaper, provided no claims for lien have been registered or preserved against the property title (Section 31).
Task Phase / Inspection Sign-Off
Draw %
Gross Draw ($)
10% Holdback Retained
Net Invoice Payable
Cumulative Progress Totals
100%
$0
$0
$0
Statutory 10% Lien Holdback Reserve Fund
Payable on Day 61 following Form 9 Substantial Performance publication, subject to title search clearance.
Total Retainage to Release$0
5
Formal Proposal Review & Client Approvals
Review final scope certification, print legal proposal package or submit for on-site verification.
Step 5 of 5
Prepared For
Project ScopeKitchen Remodel
380 SQ FT • Premium Finish Grade
Total Contract Value (HST Inc.)$0 CAD
Includes 13% Ontario HST
Scope Guarantee & Contractor Feasibility Clause
This project projection is formulated based on current Toronto trade standard labour allowances, material indices, and client plan annotations. All preliminary pricing is guaranteed within 5% variance pending formal on-site structural and mechanical audit by The Reno Coach consultant team.
Project Cost Summary
Toronto · CAD
Estimated Project Range
$0to$0
Market tolerance based on site condition variance.
Direct Materials & Labor Subtotal$0
Unforeseen Contingency (10%)
$0
GC Project Overhead & Supervision (12%)
$0
Subtotal Before Taxes$0
HST (13.00%)
Ontario Harmonized Tax$0
Total Contract ValueFull turnkey commitment
$0
Statutory 10% Lien Holdback:
$0
Held back across 10 milestone draws and released 60 days following Form 9 Substantial Completion.
Add Custom Scope Line Item
Send Package to The Reno Coach
380 SQ FT • Kitchen Remodel
$0
0 Pins on blueprint
Please enter a Toronto postal code (starts with M) — this estimator uses Toronto pricing only.
Estimate Ready to Send
Your email app will open with your estimate summary addressed to the Office. Press send in your email to complete your request, and a consultant will follow up.